Houzz Logo Print

木目調の浴室・バスルーム (グレーの洗面カウンター、ニッチ、分離型トイレ) の写真

Vanity, Mirrors & Sliding Barn Door
Vanity, Mirrors & Sliding Barn Door
ING ConstructionING Construction
Pasadena, CA - Complete Bathroom Addition to an Existing House For this Master Bathroom Addition to an Existing Home, we first framed out the home extension, and established a water line for Bathroom. Following the framing process, we then installed the drywall, insulation, windows and rough plumbing and rough electrical. After the room had been established, we then installed all of the tile; shower enclosure, backsplash and flooring. Upon the finishing of the tile installation, we then installed all of the sliding barn door, all fixtures, vanity, toilet, lighting and all other needed requirements per the Bathroom Addition.
Living for Today and Tomorrow
Living for Today and Tomorrow
McCabe By Design LLCMcCabe By Design LLC
A pocket door replace the former swing door, maximizing the width of the doorway for accessibility. Photo: A Kitchen That Works LLC
シアトルにある中くらいなトランジショナルスタイルのおしゃれなマスターバスルーム (アンダーカウンター洗面器、落し込みパネル扉のキャビネット、中間色木目調キャビネット、クオーツストーンの洗面台、ダブルシャワー、分離型トイレ、ベージュのタイル、磁器タイル、ベージュの壁、リノリウムの床、ベージュの床、開き戸のシャワー、グレーの洗面カウンター、ニッチ、洗面台2つ、造り付け洗面台) の写真
Complete Master Bathroom Addition / Sliding Barn Door, Vanity, Mirrors & Floor T
Complete Master Bathroom Addition / Sliding Barn Door, Vanity, Mirrors & Floor T
ING ConstructionING Construction
Pasadena, CA - Complete Bathroom Addition to an Existing House For this Master Bathroom Addition to an Existing Home, we first framed out the home extension, and established a water line for Bathroom. Following the framing process, we then installed the drywall, insulation, windows and rough plumbing and rough electrical. After the room had been established, we then installed all of the tile; shower enclosure, backsplash and flooring. Upon the finishing of the tile installation, we then installed all of the sliding barn door, all fixtures, vanity, toilet, lighting and all other needed requirements per the Bathroom Addition.
Installation of Vanity and Sliding Barn Door
Installation of Vanity and Sliding Barn Door
ING ConstructionING Construction
Pasadena, CA - Complete Bathroom Addition to an Existing House For this Master Bathroom Addition to an Existing Home, we first framed out the home extension, and established a water line for Bathroom. Following the framing process, we then installed the drywall, insulation, windows and rough plumbing and rough electrical. After the room had been established, we then installed all of the tile; shower enclosure, backsplash and flooring. Upon the finishing of the tile installation, we then installed all of the sliding barn door, all fixtures, vanity, toilet, lighting and all other needed requirements per the Bathroom Addition.

木目調の浴室・バスルーム (グレーの洗面カウンター、ニッチ、分離型トイレ) の写真

1