Lake Rope Bridge for London Wetlands Centre 'Wild Walk' project
Design and constructed as a suspended Rope Bridge using end-to-end steel cables anchored by certified and load-tested ground anchors. The whole Rope Bridge system is inbound on the cables and entirely zero-impact to the local ground.
Celcure treated and ribbed deck boards are set onto ropes and steel cables underneath with hand-weaved rope work forming the friction-weave balustrade.
www.rope-bridges.com